Clients
|
Job Description |
| 1 |
PT. Energi Sengkang |
Design & install piping system within steam and water cycle (Boiler & Turbin area) |
| 2 |
PT. TPPI Utiliy Plant |
Engineering study of HRSG (Modification duct burner & BMS Logic) |
| 3 |
PT. Medco Ethanol |
CFD Modelling of gas burner & installation piping |
| 4 |
PT. Energi Sengkang |
Sizing and supply variable support for Combined Cycled Power plant 60 MW |
| 5 |
PT. Petrokimia |
Detail Engineering Mechanical & Civil |
| 6 |
PT. Indomarine |
Detail Engineering Boiler |
| 7 |
PT. Pertamina LPG |
Engineering study & Assesment sarfas existing and upgrading |
| 8 |
PT. PJB Services |
Pembongkaran ,Pemasangan dan Setting Coal Conveyor boiler feed |
| 9 |
PT. DEN |
Supply and Install Variable Spring Hanger |
| 10 |
PT. Tripatra |
Desain dan Fabrikasi Mobile Platform |
| 11 |
PT. Indokomas |
Fabrication and Supply Scraper Conveyor System |
| 12 |
Express Integrated USA |
Design and Detailing HRSG Boiler |
| 13 |
PT. Badak LNG |
Engineering & Inspection Pipe Support |
| 14 |
PT. PLN Tanjung Pinang |
Supply Rotary Valve |
| 15 |
PT. PLN Tanjung Pinang |
Supply Travelling Grate Stoker Boiler |
| 16 |
PT. PLN Tanjung Pinang |
Supply Spreader Stoker Boiler |
| 17 |
PT. PJB Services Ende |
Supply Deaerator pump |