- Plant : Sengkang CCPP Block 2
2xGT 60MW – 2xHRSG – 1xSTG 60MW
- Owner : PT. Energy Sengkang (Energy World Group)
- Scope : Design & install piping system within steam and water cycle
•Determine the pipe routing
•Perform pipe stress analysis
•Install steam and water piping
•Calculate the pipe force and moment (F&M) for interfacing with steam turbine, pumps, ejectors, condenser and deaerator
•Supply & install pipe support, including hanger, strut, expansion joint