Piping Design, Integration and Construction of Sengkang

Piping Design, Integration and Construction of Sengkang
Piping Design, Integration and Construction of Sengkang
  • Plant  :  Sengkang CCPP Block 2

 2xGT 60MW – 2xHRSG – 1xSTG 60MW

  • Owner  : PT. Energy Sengkang (Energy World Group)
  • Scope   : Design & install piping system within steam and water cycle
•Determine the pipe routing
•Perform pipe stress analysis
•Install steam and water piping
•Calculate the pipe force and moment (F&M) for interfacing with steam turbine, pumps, ejectors, condenser and deaerator
•Supply  & install pipe support, including hanger, strut, expansion joint
 
 
 
 
 
?>